English: http://www.confederationline.ca/wp-content/uploads/2015/01/Final-Confederation_Line_Look_Ahead_2015_EN.pdf
french: http://www.confederationline.ca/wp-content/uploads/2015/01/Final-Confederation_Line_Look_Ahead_2015_FR.pdf
Look ahead at the future, Transitway detour begins this summer...
http://www.confederationline.ca/wp-content/uploads/2015/01/Confederation-Line-Newsletter.pdf
Looks like they are going fancier on their news operations. ^^^
To get to the main General Hospital, one has to take the 106 for about 8-10 minutes. And the Riverside one, is 3 stops away on the 97 (3-5 minutes). The confederation line will NOT link to these hospitals.
Other than the fact, we tend to forget that not many people in that area takes the bus and that we're interested in improving the Transitway (as a regional commuting system). Therefore, I'm hoping that they seriously make us go backwards to an on-surface route through Richmond Road (slowing down...
The widening of the 417 (Related project where temporary bus lanes will be placed during construction) has continued. Saturday's picture of the Lees Overpass being replaced over the weekend.
The overpass is planned to be opened next week and the 417 is open in both directions as of sunday...
I'm still wondering how they plan to temporarily move Hurdman, Lees and Campus Stn stretch. They need to still connect the 97, 98, 99 and etc to the Transitway network. Rideau River and Canal make it difficult. Any idea?