Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
News
Feb 05, 2024
Announcing SkyriseCities Ottawa Forum!
1.9K
0
News
Jan 27, 2020
Diamond Schmitt-Designed Library and Archives Revealed in Ottawa
2.1K
0
News
Nov 14, 2019
Second Tower in Ottawa's Greystone Village Reaches Milestone
2.3K
0
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
smallspy's latest activity
S
smallspy
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
There are a limited number of companies and crews that are available (and legally able) to work in the railroad environment. In many...
Oct 29, 2025
S
smallspy
replied to the thread
VIA Rail
.
It is CWR, and it is all CWR. What you felt were either the very infrequent rail gaps for signalling equipment and expansion joints, or...
Oct 29, 2025
S
smallspy
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
It would require some rework of the signal system as it has been completed along with undoing some other work that they've already...
Oct 29, 2025
S
smallspy
replied to the thread
TTC: Streetcar Network
.
As I've written many, many times before..... The switches are not the problem. They have never been a problem. The problem is with the...
Oct 29, 2025
S
smallspy
replied to the thread
TTC: Other Items (catch all)
.
While I can't identify what the orange circles are for, the concrete cuts are to install the antennas for the various systems at the...
Oct 28, 2025
S
smallspy
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
This is not quite true, at least not yet. The current active track meanders from being the future east and west tracks at several...
Oct 28, 2025
S
smallspy
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
That's exactly what they're doing. They're even considering having a mid-week closure of the Lakeshore West line - that's how bad...
Oct 28, 2025
S
smallspy
replied to the thread
Roads: Redway Road Extension / "Leaside bypass"
.
For the record..... Most of the opposition was not from Rosedale. It was from Leasiders. The site had been a manufacturing/retail site...
Oct 27, 2025
S
smallspy
replied to the thread
Roads: Redway Road Extension / "Leaside bypass"
.
So you don't believe in induced demand then..... Dan
Oct 27, 2025
S
smallspy
replied to the thread
Roads: Redway Road Extension / "Leaside bypass"
.
Please no. We don't need cars in Crothers Woods. Dan
Oct 27, 2025
S
smallspy
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
The work being done was affecting the CPKC bridge overhead. It is expected that it may take another 4 or 5 years in order to engineer a...
Oct 27, 2025
S
smallspy
reacted to
APTA-2048's post
in the thread
Train Spotting
with
Like
.
9159 looking very sharp with its new coat of paint.
Oct 27, 2025
S
smallspy
replied to the thread
Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)
.
I would counter that it's not different. I know of people who came in from Belleville, Stoney Creek, Barrie and Woodstock for lowly...
Oct 22, 2025
S
smallspy
replied to the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
Visibility is not nearly as good in a tunnel as it is outside. It's much harder to gauge stopping distances, for instance. So yes, you...
Oct 22, 2025
S
smallspy
replied to the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
Sort of. It needs an asterisk. A line operating as GoA4 with the public needs to have a lot of additional systems and features in order...
Oct 22, 2025
Members
Back
Top