1186-1194 Wellington St West | 60m | 16s | Welldale Limited Partnership (Minto) | Dialog

It looks like demo is about to start

20250323_174248.jpg
20250323_174251.jpg
 
Since these photos, the rounded feature / sign of the church (previous theater?) is now removed. It was disassembled. Looks like most of the critical stuff is out and tear down imminent?
 
Last edited:
Really hope we can get that gas station redeveloped sooner than later. Would be great to have all 4 corners built-up.
 
Demolition is well underway. Had to squeeze a photo through a tear in a large protective sheet containing the dust and debris. Not sure if visible in the photo but they were spraying down dust with a water hose.
20250522_130006.jpg
 
That was fast! Should be a great addition to the area.

And welcome back!
Thank you!

When was the last time we got a Minto highrise? Lansdowne? Westboro? I think they have built both of their awesome midrises in New Edinburgh since the last highrise. Say what you want about their singles and towns, but they never disappoint on their midrise and highrise builds!
 
Thank you!

When was the last time we got a Minto highrise? Lansdowne? Westboro? I think they have built both of their awesome midrises in New Edinburgh since the last highrise. Say what you want about their singles and towns, but they never disappoint on their midrise and highrise builds!
Agreed. Another great mid-rise is Bank + Fifth where they managed to 163 apartments while preserving a heritage commercial strip fronting Bank. And of course, Minto Metropole 20 years ago that set a new standard (that very few followed the following decade+). It's just too bad they don't build more.
 
Scaffolding from demo is all gone. HCM Drill/ pile rig is on site. Took a walk around perimeter. Some Construction Survey control is laid out at all 4 corners noted by orange paint and cut crosses. 2 offset control points set on the East side of Parkdale. 2 main corner points reset on the West Boundary marked by wood stakes. Would appear to be no delay between demolition and construction start.
 