335 Roosevelt Ave | ?m | 13fl+14fl | Uniform | Hobin

Upon returning to Ottawa from my cottage today noted 3 bore holes were drilled from the above photos for a total of 9 holes.

2 single detached residential dwellings still to be demolished. Noted one had laundary hanging in the backyard so it is still occupied.
 
There was an excavator working on the site this morning, digging some fairly wide holes. Presumably doing more site prep or soil work. I have a hunch phase one (the building fronting Roosevelt) will start next year.
 
It's just the one excavator but it's been working all week and was drilling rock last night. A wide swath in the area of phase one. Seems this one may actually be starting.
 
IMG_7407.jpeg

Snow made it really not worth but they are only in the Roosevelt side. Isn’t too much action. Doesn’t appear to be serious excavation starting.
 