Ottawacurious
Active Member
Thank-you RocketFish!
EMD-BATIMO is proposing a new residential development featuring two towers of 12 and 14 storeys at 500 Av De La Famille-Cote in Orleans. Once completed, the project will offer 354 residential units, constructed in two phases: Phase 1: 216 units and Phase 2: 138 units.
379 underground and 21 surface parking spaces are available via a dedicated ramp from Bilberry Drive. The second access will be provided from Famille-Côté Avenue which would lead to a designated off-street pickup/drop-off area at the main entrance to the building.
Architect: NEUF
Development application:
https://devapps.ottawa.ca/en/applica...6-0012/details
Skyscraper discussion
Google Maps
Location:
Siteplan:
Renderings:
EMD-BATIMO is proposing a new residential development featuring two towers of 12 and 14 storeys at 500 Av De La Famille-Cote in Orleans. Once completed, the project will offer 354 residential units, constructed in two phases: Phase 1: 216 units and Phase 2: 138 units.
379 underground and 21 surface parking spaces are available via a dedicated ramp from Bilberry Drive. The second access will be provided from Famille-Côté Avenue which would lead to a designated off-street pickup/drop-off area at the main entrance to the building.
Architect: NEUF
Development application:
https://devapps.ottawa.ca/en/applica...6-0012/details
Skyscraper discussion
Google Maps
Location:
Siteplan:
Renderings:




