News   Feb 05, 2024
 914     0 
News   Jan 27, 2020
 1.8K     0 
News   Nov 14, 2019
 2K     0 

Search results

  1. M

    General Update/Rumour Thread

    Paterson Group taking core samples at 1380 Wellington Street West.
  2. M

    The Westmount | 398-406 Roosevelt Ave. | 21m | 6s | ML DEVCO | RLA

    Marathon Drilling equipment arrives on site.
  3. M

    The Westmount | 398-406 Roosevelt Ave. | 21m | 6s | ML DEVCO | RLA

    Site prep almost completed. Site being levelled and almost all debris is removed. Fence along Street frontage has been moved out blocking a half lane.
  4. M

    The Sky | 190.49m | 55s | Richcraft Homes | Graziani + Corazza

    Tesla never stopped occupying In fact the software Co vacated and Tesla converted the space into a showroom. 2 days ago out on a bike ride the signage for the insurance Co. was gone. I confirmed with a Google search they moved to office space at TD Place 979 Bank Street so that space is...
  5. M

    327 Richmond Rd | 30m | 9s | CLV+InterRent | Hobin

    Bell lines are still attached to the house on Winona. Until that is dealt with the demo of the house could be delayed.
  6. M

    327 Richmond Rd | 30m | 9s | CLV+InterRent | Hobin

    Different angle for the Low rise apartment building. Almost gone.
  7. M

    New Ottawa Civic Hospital | The Ottawa Hospital | HDR

    Hoisting preformed decking July 25th.
  8. M

    Andaz Ottawa Byward Market | 56.08m/59.37 | 16s/18s | Claridge Homes | NEUF

    Excavation well underway. Taken July 26th.
  9. M

    Claridge Hintonburg | 99m | 30s | Claridge | architectsAlliance

    Taken yesterday from the Staircase down to trillium MUP.
  10. M

    Roads: Highways in the National Capital Region

    2 shots taken prior to the start of Preston Street HWY 417 rapid Bridge replacement.
  11. M

    327 Richmond Rd | 30m | 9s | CLV+InterRent | Hobin

    2 down 3 to go.
  12. M

    1047 Richmond Rd | 112/121m | 36/38s | Fengate | RLA

    Driving by today noticed 3 pieces of equipment on site. One shovel, one explosives drill rig with large generator. I have no idea about site plan control for this one. After the OLT agreement was reached Re: zoning this project disappeared from Devapps. Is this equipment for 1047 Richmond or is...
  13. M

    1640-1660 Carling Ave. [Former Canadian Tire] | 63/69/78/93/125/135m | 18/20/24/28/37/40s | Riocan | Hobin

    I have taken a couple of walks around the site since the redevelopment of the Recreation club started. I was hoping the two southern wings beyond the covered parking might be demolished to allow for partial developement. It looks like the entire existing building foot print will be used for the...
  14. M

    Aylmer/ Champlain Village/Mixed Use Residential/Brigil

    Correction: Phase 2 will consist of 329 units including a community building with pool.
  15. M

    The Talisman | 72m | 22s | Holloway Lodging | Geiger Huot

    Took photos yesterday while out cycling.
  16. M

    O-Train East-West Line 1 & Line 3

    They have started laying rail east of Island Park Drive towards Tunnys Pasture Stn. Still lots of patch areas to infill where rebar and concrete footings are not yet poured.
  17. M

    Gatineau | Le W/E 2/3 | ?m | 13/26s | Heafey | PMA

    Took a photo from Chaudier Dam. It looks like Tower Crane maybe up for tower 2.
  18. M

    New Ottawa Civic Hospital | The Ottawa Hospital | HDR

    Eastern garage being back filled and tamped down.

Back
Top