Previous Discussion on SSP
Project Website
Location: 11 Laurier St.
Project Description:
This project consists of a complete overhaul of both the inside and outside of the building. As part of the planned midlife renewal work, we are doing much-needed renovations and are replacing systems that have reached the end of their useful life.
The project includes:
The Portage III Asset and Workplace Renewal (AWR) Project is divided into two phases and will consist of renovations to the inside and the outside of the building.
Phase 1 (2018 to 2027) is currently underway. It will address the interior workplace refit of the western towers (C1, C2, D and B3) by 2024, and base building systems throughout the complex by 2027.
Phase 2 (2024 to 2027) will address the interior workplace refit of the eastern towers (A1, A2, B1, B2 and E).
Renderings:
Project Website
Location: 11 Laurier St.
Project Description:
Portage III renewal project
This project consists of a complete overhaul of both the inside and outside of the building. As part of the planned midlife renewal work, we are doing much-needed renovations and are replacing systems that have reached the end of their useful life.
The project includes:
- replacing base building systems, such as:
- windows
- the building exterior (also known as the building envelope)
- plumbing
- electrical systems
- heating and cooling systems
- modernizing the interior workplace
- updating security systems
- installing new information technology
Phases of project
The Portage III Asset and Workplace Renewal (AWR) Project is divided into two phases and will consist of renovations to the inside and the outside of the building.
Phase 1 (2018 to 2027) is currently underway. It will address the interior workplace refit of the western towers (C1, C2, D and B3) by 2024, and base building systems throughout the complex by 2027.
Phase 2 (2024 to 2027) will address the interior workplace refit of the eastern towers (A1, A2, B1, B2 and E).
Renderings:
Last edited: