Greystone Village | ?m | 9s | eQ Homes | Barry J. Hobin & A.

Looks like the perimeter walls are all up. Excavation in earnest was happening yesterday with an ongoing daisy chain of trucks hauling out the clay soil.
Photo from a few days ago as this area hasn't been dug out further yet. Won't be long!
1000006720.jpg
 
There are 2 large buildings at the back of the site being built plus they'll still need to renovate the monastery to include the catholic school (bottom 3 floors) and seniors low income housing (top 2 floors).

This won't look like this as the houses in the forecourt will slightly block this view:
1000006746.jpg

If walking along the river trail, this is what you'd see (bottom photo of the two is the existing seniors residence):
1000006748.jpg


this is the view from where I took my photo albeit further back:
1000006750.jpg

The inner court. The sidewalk is to be public however wont be maintained in the winter months. The shrub fence i think is the school yard? Dunno.
1000006752.jpg
 

Attachments

  • 1000006752.jpg
    1000006752.jpg
    691.7 KB · Views: 36
Removing the last of the truck ramp for the excavation. Nearly all cleared out. Also dropping off or installing some sort of crane thing today.
1000007137.jpg

1000007138.jpg
 

Back
Top