Looks like the perimeter walls are all up. Excavation in earnest was happening yesterday with an ongoing daisy chain of trucks hauling out the clay soil.
Photo from a few days ago as this area hasn't been dug out further yet. Won't be long!
There are 2 large buildings at the back of the site being built plus they'll still need to renovate the monastery to include the catholic school (bottom 3 floors) and seniors low income housing (top 2 floors).
This won't look like this as the houses in the forecourt will slightly block this view:
If walking along the river trail, this is what you'd see (bottom photo of the two is the existing seniors residence):
this is the view from where I took my photo albeit further back:
The inner court. The sidewalk is to be public however wont be maintained in the winter months. The shrub fence i think is the school yard? Dunno.
I'll also add Forecourt has the foundations started. Additionally, the other large preexisting red brick building (where the nuns lived? 15-17 oblats) Is undergoing major renovations on the interior. All windows open and stripped backed to the studs in more than a few places.
https://forumam.com/real-estate/15-17-des-oblats for photos. Lots of common living spaces for the 215 studio units. There's an additional 69 other sized units including 10 three bedroom units.