Andaz Ottawa Byward Market | 56.08m/59.37 | 16s/18s | Claridge Homes | NEUF

I also can't find the actual application for the George facing tower? I see a site plan for a temporary parking from 2017 but it doesn't even match to this currently approved version. But if you look on those drawings Claridge seems to have something about a future development?
 
I also can't find the actual application for the George facing tower? I see a site plan for a temporary parking from 2017 but it doesn't even match to this currently approved version. But if you look on those drawings Claridge seems to have something about a future development?
It was approved with the first Andaz tower a decade ago. See the conversations on SSP: https://skyscraperpage.com/forum/showthread.php?t=203360

1722618571188.png


And for fun, the site before the Andaz.

1722618603899.png
 
Last edited:
They are fully excavating the footprint of the 23s tower, as we've all suspected. I wonder if they'll roll right into that along with or after the hotel addition. What would they do otherwise? Cap the garage and fence it off? Surface parking?

DJI_0057-HDR.jpg
 
When is the last time we heard about that planned building? It's been ages... wonder what the last render or floorplate even looked like.
 
When is the last time we heard about that planned building? It's been ages... wonder what the last render or floorplate even looked like.
We haven't seen any updates since the project was proposed and approved about a decade ago. With the Hampton Inn site included, I'm very suprised Claridge hasn't presented a whole new proposal for the entire site.
 
I can't see surface parking, because quite frankly it would be a security nightmare in that location. Same with a park. If they aren't building out the other tower, I can only imagine it being a fenced off site for a few years.
 

Back
Top