Damn...That station integration would have been amazing. I'm still pissy that there isn't direct access through the Dream and OCH lots to the library with some kind of tunnel or halllway.
With WSP on site, pretty sure they are doing excavating windows for further environmental testing. 2 weeks min. Before the big dig
How s that?This whole thing seems a bit precarious.
The excavator is right on the edge, and clearly removed some sod from the hill. The hill itself is sketchy, not sure the material it's built out of. I'm used to seeing retaining walls or limestone trenches, not just a steep hill.How s that?