News   Feb 05, 2024
 1.7K     0 
News   Jan 27, 2020
 2.1K     0 
News   Nov 14, 2019
 2.2K     0 

YOW Alt Hotel | ?m | 7s | Le Germain | LemayMichaud Architecture Design

I'm glad we are getting this as well, it will fill a very urgent need and enhance our airport to international standards at the very least. I wonder if after this and Line 2 opens if the airport authority are going to jump straight into a terminal expansion. that would be great!!
 
I'm glad we are getting this as well, it will fill a very urgent need and enhance our airport to international standards at the very least. I wonder if after this and Line 2 opens if the airport authority are going to jump straight into a terminal expansion. that would be great!!
I really hope they expand the US section at the same time as the planned extension of the domestic gates. It's so overdue.
 
Awesome to see the hotel coming together!

On the note of terminal expansion, probably a pipe dream but would be nice if they included a Domestic - Transborder connection option that didn't require travellers to exit and re-clear security on the TB side.
 
It ain't pretty, but it is an important thing for Ottawa!

1333.jpg
 
The core seems to stick out quite a lot. Hoping this means they built it in a way to one day allow that glassed-in top floor that had to be dropped due to City Council not up-holding the CIP Program they themselves approved a year earlier.
 

Back
Top