I haven't been following this too closely. Am I correct in assuming, as I look at that map and the link that you provided, that:
What is the target date for opening of Phase 1? Are they really on track to commence construction of Phase 2 in 2018? What's the status of the airport extension? What's the status/timing of Phase 3 (extension out to Kanata)?
- the Confederation Line from Lebreton to Blair is under construction?
- Lebreton to Bayshore/Baseline and Blair to Place d'Orleans are Phase 2, along with an extention of the Riverside line to Riverside South?