1047 Richmond Rd | 112+121m | 36+38s | Fengate | RLA

So by the pics that were taken I found the web site for Geo source and I took this from there website . I think they are there installing the geo thermal system first , and once that is done they will begin the full excavation .

"Drill from Grade:Our Patented Process​


Drilling from inside an excavated area can be a risky, expensive, and time-consuming effort. Our patented approach involves drilling and installing the vertical portion of our systems before the main excavation program begins – this simple, yet ingenious method is instrumental in delivering geoexchange projects in a safe and timely manner."
 