Odenak | 665 Albert St. | 105+120m | 31+36s | Dream+Multifaith | Perkins&Will+KPMB+Two Row | U/C

These are soaring, I really hope they work on another tower with the NCC. NCC needs to award Dream another lot, ASAP.
As much as I would love that, Dream also needs to work on Zibi. They have one tower going up, but it seems to be taking forever.
 
As much as I would love that, Dream also needs to work on Zibi. They have one tower going up, but it seems to be taking forever.
I'm actually kind of ok with Zibi going a bit slower than Lebreton, I love the island development and it is a big component to show Ottawa is more of a waterfront city than it looks like, but I feel like they're able to move faster on Lebreton development because working with NCC was probably easier than dealing with the city alone for Zibi. I could be wrong, but another tall tower by Dream coming up within 1-2 years after this is done and then going back on focusing with Zibi would be solid, in my opinion.
 
We're up to 8 on the taller tower. it's interesting how much taller the ground level is in the 36s tower vs the 31s tower. Also, the very first three panels of glass have been installed in the ground floor of the 36s tower.

4565.jpg

4566.jpg

4567.jpg

4569.jpg
 
We're up to 8 on the taller tower. it's interesting how much taller the ground level is in the 36s tower vs the 31s tower. Also, the very first three panels of glass have been installed in the ground floor of the 36s tower.
They are actually forming level 10 in your image!

And the ground floor heights on both towers are the same. You might be getting confused because there is a partial floor on each tower (was originally a mezzanine). That floor is where most of the bike parking is.
 
Can really start seeing it's impact on ground level. This is what all tower should be; podiums of 4 to 6 floors and a slim tower that allows light and air to reach the ground. We should no longer allow built forms like much of Rideau projects over the last 20 yeas or the majority of the CBD's wall to wall office towers.
 
Can really start seeing it's impact on ground level. This is what all tower should be; podiums of 4 to 6 floors and a slim tower that allows light and air to reach the ground. We should no longer allow built forms like much of Rideau projects over the last 20 yeas or the majority of the CBD's wall to wall office towers.
Tell that to Ville de Gatineau 😆

No, seriously....tell that to Ville de Gatineau.....
 